Projects

Twelvetrees Crescent Pipe Crossing

Maintenance painting and anti-climb measure installation to two 48 inch Cadent medium pressure gas mains spanning approximately 100 metres over Bow Creek and the River Lea at Twelvetrees Crescent.

Specialist works delivered in a live infrastructure setting

After eight years of planning, WG Beaumont carried out maintenance painting and anti-climb measure installation to two 48 inch Cadent medium pressure gas mains at Twelvetrees Crescent, Bromley-by-Bow. The mains span approximately 100 metres over Bow Creek and the River Lea. The project required detailed planning, access coordination and careful delivery around major pipe crossing infrastructure. The completed works improved the condition of the assets while adding deterrent measures to reduce unauthorised access.
Client

Cadent Gas

Location

Twelvetrees Crescent, Bromley-by-Bow, London

Service Provided

Pipe crossing maintenance painting; anti-climb measure installation; protective coating works; access planning; major gas main crossing works.

timelapseltd.co.uk-52
Project Video

Watch the Twelvetrees Crescent Pipe Crossing project video

View footage from the Twelvetrees Crescent Pipe Crossing project, showing the site environment, access requirements and specialist works carried out by W. G. Beaumont
Case studies

More project case studies

Explore other examples of protective coatings, tank lining, pipe crossing works, rail access and infrastructure maintenance delivered by W.G. Beaumont.

Shalford Pipe Crossing

SGN & THAMES WATER

Shalford Pipe Crossing
Located over the River Wey, Shalford, the pipe bridge supports 1no 12” IP Gas Main and 2no 12” Water Mains. Due to the location of the bridge, access was only possible via pontoon.
Main Image

Aviation Fuel Depot

Fuel Storage Tank Internal Lining
Internal tank lining projects require controlled preparation, careful access and coating discipline because the completed system supports the continued performance of storage infrastructure.
Brunel Bridge Pipe Crossing

Cadent Gas

Brunel Bridge Rail Crossing
Essential maintenance painting works to a 240 metre, 12 inch low pressure Cadent Gas main attached to Network Rail infrastructure in Windsor, including the listed Brunel Bridge over the River Thames. Works also included pipe support upgrades and support for gas main repairs.
Project enquiries

Have a similar asset, crossing or coating project?

Send the details to W. G. Beaumont for review, including asset location, access constraints and any coating or lining specification available.