Brunel Bridge Rail Crossing

Essential maintenance painting works to a 240 metre, 12 inch low pressure Cadent Gas main attached to Network Rail infrastructure in Windsor, including the listed Brunel Bridge over the River Thames. Works also included pipe support upgrades and support for gas main repairs.

Specialist works delivered in a live infrastructure setting

After years of planning and liaison with the many different stakeholders involved, we carried out essential Maintenance Painting works to a 240m, 12″, LP Cadent Gas main in Windsor. The main is located in a Royal Windsor Park and attached to Network Rail Infrastructure including brick archways, a small rail bridge over the Backwater Chanel and the listed Brunel Bridge / Windsor Railway Bridge over the River Thames. In addition to our usual blasting and painting scope, we were tasked with upgrading the old and failing pipe supports as well as facilitating repairs to gas main itself.
Client

Cadent Gas

Location

Windsor, Berkshire

Service Provided

Gas main maintenance painting; abrasive blasting; protective coating application; pipe support upgrades; listed bridge infrastructure works; rail stakeholder coordination.

Brunel Bridge Pipe Crossing
Project Video

Watch the Brunel Bridge Rail Crossing project video

View footage from the Brunel Bridge Rail Crossing project, showing the site environment, access requirements and specialist works carried out by W. G. Beaumont
Case studies

More project case studies

Explore other examples of protective coatings, tank lining, pipe crossing works, rail access and infrastructure maintenance delivered by W.G. Beaumont.

Shalford Pipe Crossing

SGN & THAMES WATER

Shalford Pipe Crossing
Located over the River Wey, Shalford, the pipe bridge supports 1no 12” IP Gas Main and 2no 12” Water Mains. Due to the location of the bridge, access was only possible via pontoon.
Main Image

Aviation Fuel Depot

Fuel Storage Tank Internal Lining
Internal tank lining projects require controlled preparation, careful access and coating discipline because the completed system supports the continued performance of storage infrastructure.
timelapseltd.co.uk-52

Cadent Gas

Twelvetrees Crescent Pipe Crossing
Maintenance painting and anti-climb measure installation to two 48 inch Cadent medium pressure gas mains spanning approximately 100 metres over Bow Creek and the River Lea at Twelvetrees Crescent.