Norn Hill Rail Crossings Access Deterrent Measure Installation

Installation of access deterrent measures to 12 inch low pressure and 24 inch medium pressure gas mains spanning over a live railway. Works were completed during a 12-hour weekend road closure using negative reach MEWPs, with the possession handed back ahead of schedule.

Specialist works delivered in a live infrastructure setting

Located either side of two road / rail bridges was a 12” LP and a 24” MP, both approx. 100m in length spanning over a live railway. The scope here was to install Access Deterrent Measures to the mains. Due to the location of the crossings and the possession window that was made available to us, we carried out the works by closing the road for 12 hours over a weekend and accessing the pipes using negative reach truck mounted MEWPs. All ADM’s were installed and NR’s possession handed back well before the deadline, then site cleared and bridges re opened to the public ahead of schedule.
Location

Norn Hill

Service Provided

Access deterrent measure installation; rail possession works; negative reach MEWP access; pipe crossing safety works; weekend road closure delivery.

Main Picture
Project gallery

Images from the Norn Hill Rail Crossings Access Deterrent Measure Installation works

A closer look at the working environment, access arrangements and completed asset condition.

Case studies

More project case studies

Explore other examples of protective coatings, tank lining, pipe crossing works, rail access and infrastructure maintenance delivered by W.G. Beaumont.

Shalford Pipe Crossing

SGN & THAMES WATER

Shalford Pipe Crossing
Located over the River Wey, Shalford, the pipe bridge supports 1no 12” IP Gas Main and 2no 12” Water Mains. Due to the location of the bridge, access was only possible via pontoon.
Main Image

Aviation Fuel Depot

Fuel Storage Tank Internal Lining
Internal tank lining projects require controlled preparation, careful access and coating discipline because the completed system supports the continued performance of storage infrastructure.
Brunel Bridge Pipe Crossing

Cadent Gas

Brunel Bridge Rail Crossing
Essential maintenance painting works to a 240 metre, 12 inch low pressure Cadent Gas main attached to Network Rail infrastructure in Windsor, including the listed Brunel Bridge over the River Thames. Works also included pipe support upgrades and support for gas main repairs.
Project enquiries

Have a similar asset, crossing or coating project?

Send the details to W. G. Beaumont for review, including asset location, access constraints and any coating or lining specification available.