Hogsmill Abandoned Pipe Crossing Removal

Removal of an abandoned 18 inch spun iron pipe crossing above the Hogsmill River walkway. The works included stakeholder liaison, encapsulated scaffold access, pipe cutting and removal, and capping of the remaining main on both sides of the river.

Specialist works delivered in a live infrastructure setting

Our client had an abandoned 18” spun iron pipeline that ran parallel to a railway line, located in the Hogmill Riverside Open Space. Due to the addition of the Hogsmill River Walkway the abandoned pipe became a hazard to members of the public who had to duck under the pipe while using the walkway. After liaising with the Environment Agency, Local Council and Network Rail, we erected an encapsulated access scaffold over the walkway, cut and removed the pipe then capped off both ends of the remaining main on either side of the Hogsmill River.
Location

Hogsmill Riverside Open Space

Service Provided

Abandoned pipe crossing removal; encapsulated access scaffold; pipe cutting and removal; pipe capping; public walkway safety works.

Main Picture
Project gallery

Images from the Hogsmill Abandoned Pipe Crossing Removal works

A closer look at the working environment, access arrangements and completed asset condition.

Case studies

More project case studies

Explore other examples of protective coatings, tank lining, pipe crossing works, rail access and infrastructure maintenance delivered by W.G. Beaumont.

Shalford Pipe Crossing

SGN & THAMES WATER

Shalford Pipe Crossing
Located over the River Wey, Shalford, the pipe bridge supports 1no 12” IP Gas Main and 2no 12” Water Mains. Due to the location of the bridge, access was only possible via pontoon.
Main Image

Aviation Fuel Depot

Fuel Storage Tank Internal Lining
Internal tank lining projects require controlled preparation, careful access and coating discipline because the completed system supports the continued performance of storage infrastructure.
Brunel Bridge Pipe Crossing

Cadent Gas

Brunel Bridge Rail Crossing
Essential maintenance painting works to a 240 metre, 12 inch low pressure Cadent Gas main attached to Network Rail infrastructure in Windsor, including the listed Brunel Bridge over the River Thames. Works also included pipe support upgrades and support for gas main repairs.